Logo of the Ministry of Energy and Energy Industries

Guidelines

  Storage
MEEA Service Station Inspection Checklist695 KB
 Competitive Bid Round
2010 CBO Data Use Agreement133 KB
2010 Competitive Bidding Order (2012 version to be added)418 KB
2010 Draft Deep Water Model PSC (2012 version to be added)566 KB
Annex A- Description of Area4 KB
Annex B- Data To Be Submitted By Licensee105 KB
Annex C- General Provisions288 KB
Annex D- Marketing Procedures For Gas355 KB
Annex E- Procedure for the Determination of Work Units195 KB
Bid Data Packages 2012 216 KB
Bid Data Packages by Location1,572 KB
Final 2012 Deep Water Techincal, Legal and Commercial Presentation12,051 KB
Final Deep Water PSC Documents259 KB
International Roadshow Presentation (IP and Nape Expo 2012)7,848 KB
Local Content & Local Participation Framework4,449 KB
Notes on the PSC88 KB
PGS 2012 Presentation on Trinidad 5,375 KB
PGS MC2D Overall Programme182 KB
Prequalification Criteria for Participation in Competitive Bid Round423 KB
Procedure For Obtaining a Bid Round Data Package 409 KB
PSC Stakeholder Letter1,577 KB
 Data Room
Data Room Use Guidelines103 KB
 Mining/Quarry
Mine Design Plans159 KB
 Safety and Environment
National Oil Spill Contingency Plan 20133,012 KB
 Storage
Horizontal Aboveground Storage Tanks Checklist7,645 KB
LPG Installation Checklist8,138 KB
 Technical Guidance Documents
Approved List of CVAs285 KB
GD 01: Guide To MEEI's Approval Regime For Energy-Based Facilities53 KB
GD 02: The Role of the Certified Verification Agent (CVA) in The MEEI's Approval Regime111 KB
GD 03: Verification Scheme For Offshore Structures76 KB
GD 04: Verification Scheme For Pipeline Systems69 KB
GD 05: Verification Scheme For Hydrocarbon Production And Processing Facilities85 KB
 Transportation
Guidelines for the Transportation of Petroleum by Road Tank Wagons127 KB
 
made visual by sightFACTORY